News Flash Home
The original item was published from 6/3/2019 12:33:00 PM to 6/3/2019 12:33:52 PM.

News Flash

Home

Posted on: June 3, 2019

[ARCHIVED] RFQ for Airport Runway Construction Management

The Port of Port Angeles is seeking statements of qualifications from engineering firms with substantial expertise and experience related to airport runway design and construction.
 
Required services include pavement design, civil, geotechnical, structural, and environmental engineering as well as land surveying, NEPA, and FAA and WSDOT grant compliance.  All project phases from concept to final closeout shall be included.  The selected consultant is expected to provide all necessary services from conceptual design through final construction grant closeout.  Any required services outside of the consultant’s expertise may be provided via subconsultants(s), with prior approval by the Port.  The consultant services may be performed under multiple FAA and WSDOT grants.       

A complete RFQ description can be obtained by contacting: Port of Port Angeles Dan Gase, Airport Manager Email: DanG@PortofPA.com
 
Interested firms shall provide a detailed statement of qualifications as outlined in the RFQ and should not to exceed thirty (30) pages cover to cover, no later than Friday, June 28, 2019 via mail or hand delivery to: Port of Port Angeles Attn: Dan Gase, Airport Manager 338 West 1st Street Port Angeles WA 98362
 
 

Additional Info...
Facebook Twitter Email

Other News in Home

Port Logo Newsflash

April 2019 Port Pilot Released

Posted on: April 14, 2019
JWM aerial news flash photo

John Wayne Marina Final RFI Released

Posted on: March 22, 2019
Port Logo Newsflash

March 2019 Port Pilot Released

Posted on: March 5, 2019
Port Logo Newsflash

Port Declares Emergency Situation

Posted on: December 21, 2018
Laundry news flash 10-25-18

Boat Haven Laundry Facility Set to Open

Posted on: October 24, 2018
CERB-Logo-with-transparent-background news flash

Notice of CERB Funding Application

Posted on: October 10, 2018
Admin front entrance construction news flash

Admin Entrance Construction

Posted on: October 2, 2018
CERB-Logo-with-transparent-background news flash

Notice of CERB Grant Application

Posted on: September 6, 2018
Elevator closed picture 8-21-18

Elevator Closed for Upgrades

Posted on: August 21, 2018
JWM aerial news flash photo

2018 JWM Waterfront Day

Posted on: August 3, 2018
CERB-Logo-with-transparent-background news flash

Notice of CERB Funding Application

Posted on: May 15, 2018
Gussman Panorama of PABH 2017 news flash

Power Outage on PABH Floats

Posted on: December 6, 2017